PavingTilesWooden FlooringMaintenanceDatasheetsQuality
Introduction
Setting Out
Drainage
Sub Base Construction
Establishing Levels
Laying Patterns
Laying Paving
Cutting Natural Stone
Pointing and Sealing
Introduction
Required Items
Preparation and Planning
Fixing Tiles
Cutting and Use Of Borders
Sealing
Grouting
Final Clean and Seal
Introduction
Required Items
Preparation and Planning
Installing Flooring
Skirtings, Threshold and Finishing
Final Clean
Maintaining Paving
Maintaining Stone Tiles
Maintaining Wooden Flooring
Universeal Products
UltraTile Products
UltraScape Products
Dural Products
Fastenmaster Products
Sandstone Quality
Travertine Quality

Establishing Levels

Now your sub-base has been prepared, levelled and compacted now is the time to set out your string lines, these will set the finished ground level or the top of your paving. You will generally need a minimum of two string lines.... More to follow